Track Records

PAITON – 3 COAL FIRED STEAM POWER PLANT (November 2009 - December 2011)

CAPACITY

1x815 MW - Supercritical Boiler

OWNER/CLIENT

PT. Paiton Energy / MHI / Taihei Dengyo Kaisya, LTD

LOCATION

Paiton, East Java

SCOPE OF WORK

Installation of : U/G Piping (CWP), Steel Structure for T/G Building, Steel Structure for Boiler Boilers, Boiler Auxiliary, Turbine Generator, BOP & Piping, ESP / FGD, Ducting, Water Separator, Coal Bunker, Hydro test, Painting, Insulation, Lining,Assistance for pre-commissioning Test & Commissioning

 

PALABUHAN RATU 3 COAL FIRED STEAM POWER PLANT (November 2007 - December 2011)

CAPACITY

3 X 350 MW

OWNER/CLIENT

PT. PLN / Consortium Shanghai Electric China and PT Maxima Infrastructure

LOCATION

Palabuhanratu, West Java

SCOPE OF WORK

Total Plant Construction of Boiler , Turbine , Generator , BOP Plant and Substation 150 KV. Civil, Mechanical, Electrical, Instrumentation and Control System

 

CILEGON COMBINES CYCLE POWER PLANT

CAPACITY

1x 740 MW

OWNER/CLIENT

PT. PLN / Consortium with Mitsubishi Corporation

LOCATION

Cilegon, Banten

SCOPE OF WORK

Total Civil Work, Mechanical Equipment Installation, Piping Work, Electrical & Instrumentation, Substation, 150 KV Transmission Line

 

EPC FOR OIL TERMINAL (DEPOT BBM) PERTAMINA CIKAMPEK

CAPACITY

3 X 10,000 BBL Premium Tank/3 x 5000 BBL Kerosene Tank/3 x 11,500 BBL Solar Tank

OWNER/CLIENT

PT. Pertamina / PT Pertamina

LOCATION

Cikampek, West Java

SCOPE OF WORK

Engineering, Procurement, Construction, Commissioning for Area Preparation (Clearing & Grabbing, Excavation, Soil Filling), Drive Piling, Foundation, Water Pond, Road, Building, Steel Structure, Power Pole, Mechanical Equipments (Pumps, Emergency Generator set, Filling Shed), Piping, Electrical , Instruments & Panels, Telecommunication, SCADA, Fire Fighting, Painting

 

EPC FOR NORTH DURI DEVELOPMENT AREA-12 (June 2007 - December 2010)

CAPACITY

588 Well Surface Facility, 3 Location of On Plot Facility, Clearing & Grabbing 6.2 Million M2, Soil Filling 6.5 Mill M3, Piping Work 764,812 D/I or Drive Piling 7,141 Point, Road & Corridor 70 Km, Canal 58 Km, LV & MV Power Cable 384 Km

OWNER/CLIENT

PT Chevron Pacific Indonesia

LOCATION

Duri, Riau

SCOPE OF WORK

Engineering, Procurement, Construction, Commissioning for 588 Well Surface Facility, 3Location of On Plot Station, Area Preparation (Clearing & Grabbing, Excavation, Soil Filling), Drive Piling, Foundation, Road, canal, Bridge, Building, Steel Structure, Power Pole, Mechanical Equipments (Pumps Well Hookup, Vessel, Heat Exchanger, Piping, Insulation, Painting, Electrical (LV & MV) and Instruments & Panels, Telecommunication, SCADA Fiber Optic, Fire Fighting