Paiton Steam Power Plant Unit 1 & 2

Scope of Work :

Installation of 2x1,200 t/h coal-fired
Boilers, Auxiliaries & Insulation
Supply Insulation for Steam Generator & Auxialiaries
Installation of Fly Ash Pnuematic
Transport System

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client: ABB Combustion Eng.
    PT.Energy System Indonesia
    ABB Gadelius KK
  • Capacity: 2x400 MW Coal-Fired
  • Location: Probolinggo, East Java

Paiton Steam Power Plant Unit 5 & 6

Scope of Work :

Installation of 2 units Boiler and Auxiliaries
Installation of Electrostatic Precipitator
Installation of Mechanical & Piping for the Balance of Plant
Installation of Electrical for Balance of Plant

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client:ABB Combustion Eng / JEL Black & Veatch Int’l
  • Capacity: 2x660 MW Coal-Fired
  • Location: Probolinggo, East Java

Gresik Combined Cycle Power Plant

Scope of Work :

- Installation of 9x100 MW Gas Turbine
- Installation of 9x160 t/h HRSG & Auxiliaries
- Installation of 3x200 MW Steam Turbine &Auxiliaries
- Supply & fabricate pipe racks, structural steel, fire protection system piping.
- Supply & fabricate ducts, casings & chimney

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client:Mitsubishi CorporationCockerill M.I.
  • Capacity: 2x660 MW Coal-Fired
  • Location: Gresik, East Java

Suralaya Steam Power Plant Unit 5, 6, 7

Scope of Work :

- Installation of 2 units Boiler and Electrostatic Precipitators & Accessories
- Installation of 3 units Steam Turbine Generators & Piping
- Installation of Stack Liner
- Supply & install Fire Fighting System
- Material & Warehouse Management

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client:Marubeni Corp./TDK
    Mitsubishi Heavy Industries
    PT.Basuki Pratama
    Nuova Cimimontubi
  • Capacity: 3x600 MW Coal-Fired
  • Location: Suralaya

Grati Combined Cycle Power Plant

Scope of Work :

- Installation of Gas & Steam Turbines Generator & Auxiliaries
- Installation of 3 units HRSG and Auxiliaries
- Fabrication of Ductings,Casing & Chimney for 3 units HRSG
- Fabrication of Stack bottom plate Supply & Fabrication Piping for Firefighting
- EPC of 4 nos. HSD Oil Tank

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client:Mitsubishi Heavy Ind.
  • Capacity: 800 MW
  • Location: Grati

Cilegon CCPP

Scope of Work :

Total Plant Construction and Project Management Services for Gas & Steam Turbines, Generator & Auxiliaries, HRSG and Auxiliaries.
EPC for 150 kV T/L and Substation
Local Supply and fabrication of Structures, Tanks, Casing, Backstay, Duct, Stack, etc.

Project Details

  • Owner: PERUSAHAAN LISTRIK NEGARA (PLN)
  • Client:Consostium Mitsubishi – Truba Jurong Engineering
  • Capacity: 740 MW Configuration 2:2:1
    Mitsubishi GT F type
  • Location: Cilegon

Cilacap CFSPP

Scope of Work :

Complete installation of 2 unit Boilers, 2 unit Steam Turbine and Generator, EP and Balance of Plant

Project Details

  • Owner: PT Sumber Segara Primadaya (S2P)
  • Client:Chengda Engineering Corp. of China
  • Capacity: 2 X 300 MW
  • Location: Cilacap, Central Java

Tanjung Jati B CFSPP

Scope of Work :

Complete installation of 2 unit Boilers, 2 unit Steam Turbine & Generator, EP and Balance of Plant. Supply and Fabrication of Chimney inner liner

Project Details

  • Owner: PT Central Jawa Power
  • Client:Jurong Engineering Lestari / Mitsubishi
  • Capacity: 2 x 660 MW
  • Location: Cilacap, Central Java

CPS Extension in Saudi Arabia

Scope of Work :

Complete installation of gas turbine, generators, auxiliaries, compartments control cabinets, lube oil vent demisters, exhaust frame blowers, ducting & pipings, exhaust stack, air inlet housing, bus duct, electrical & instrumentation, testing

Project Details

  • Owner: SCECO
  • Client: Arabian Bemco Co. Ltd.
  • Capacity: 3 x GE Frame 7 EA
  • Location: Saudi Arabia

Bontang LNG Train F

Scope of Work :

Installation of :
- Inland Transportation
- Heavy Lifts
- Mechanical Erection works

Project Details

  • Owner: PT.Badak LNG
  • Client: PT. IKPT / Chiyoda Corp
  • Capacity: -
  • Location: Kalimantan

Arun Fields Booster Compressor

Scope of Work :

Installation of :
- Inland Transportation
- Heavy Lifts
- Mechanical Erection works

Project Details

  • Owner: Mobil Oil
  • Client: Tripatra
  • Capacity: -
  • Location:

Arun Fields Booster Compressor

Scope of Work :

Installation of :
- Steel Structures
- Inland Transportation
- Heavy Lift s
- All Mechanical Works

Project Details

  • Owner: Mobil Oil
  • Client: Tripatra
  • Capacity: -
  • Location:

Phase “B” Field Development Project

Scope of Work :

Installation of :
Construction Works (Civil Works, Mechanical, Piping, Electrical and Instrumentation )

Project Details

  • Owner: ExxonMobil Indonesia Inc.
  • Client: PT Tripatra
  • Capacity: -
  • Location:

Phase 1 Oseil Oil Field Production Facilities Project

Scope of Work :

Installation of :
Tank and Mechanical Works Electrical and Instrumentation Piping

Project Details

  • Owner: KUFPEC Indonesia Ltd
  • Client: Daewoo E&C Co.Ltd.
  • Capacity: -
  • Location: Pulau Seram, Maluku

Oil Terminal (Depot BBM) Cikampek

Scope of Work :

Engineering, Procurement and Construction (EPC)

Project Details

  • Owner: Pertamina
  • Client: Pertamina
  • Capacity: -
  • Location: Bekasi, Cikampek, Jawa Barat

Musi Pulp Mill

Scope of Work :

Total Electro-Mechanical Works of the Plant

Project Details

  • Owner: PT.Tanjung Enim Lestari
  • Client: Klockner – INA GmbH
  • Capacity: -
  • Location: Musi

Riau Andalan Pulp & Paper Mill

Scope of Work :

- Civil & Pre-casting works, Mechanical & Piping erection of Paper Machine
- Converter Building Erection, Installation of Recovery Boilers no.2 & 3
- Electrical & Instrumentation works for Paper machine, Mechanical & Piping works of Evaporator Plant
- Mechanical & Piping Installation for Fibre Line no.1
- Mechanical & Piping works for Recausticizing Plant no.2
- Civil works for: Aeration Basin, Pre-casting Pulp Dryer no.3 & Structural, Steelworks

Project Details

  • Owner: PT.Riau Andalan Pulp & Paper
  • Client: PT.Bina Sarana Pengembangan
    PT.Pectech Indonesia
  • Capacity: -
  • Location: Riau

Cibinong Cement Plant

Scope of Work :

Fabrication & erection of 2 units Electrostatic Precipitator
Fabrication & erection of Ducting structure of Kiln & Coolers

Project Details

  • Owner: PT. Semen Cibinong
  • Client: PT. Trio Wap Bumi
  • Capacity: -
  • Location: -

Indocement Plant

Scope of Work :

Supply, Fabricate & Install Clinker Handling System
Fabricate & erect Electrostatic Precipitator & Associated Mechanical equipment.
Electrostatic Precipitator for P3 Clinker Cooler installation including Civil, Mechanical & Fabrication
Supply, Fabricate & Erect P! ESP Grate Cooler & Cement Mill.
Supply & fabricate Raw Mill /Kiln ESP, & Klinker Cooler ESP
Mechanical & Civil works for P7 Kiln & Cooler Conversion and P7 CFG Cooler EP.

Project Details

  • Owner: PT. Indocement Tunggal Prakarsa
  • Client: PT. Indocement Tunggal
  • Capacity: -
  • Location: -

Nickel Smelter Plant Expansion

Scope of Work :

Installation of :
- Foundation for Kiln 4
- Install new Kiln 4, ESP, Conveyors, Calcine Transfer, Granulation and all associated Steel Structures, Piping,Electrical & Instrumentation, building/relining of existing kilns.
- Rebuilding of Furnace 2& 3, Kiln 1,2 & 3 and Dryers.
- Install Kiln 5, Coal Transfer Conveyor, New Dryer 3, relocation of sewers, drains & piping, new ESP & Multiclones.
- Install Sulphur Melt System (M/P/E/I)
- Modification of DOS 1, repairs to Dryer 1&2,Kiln 1 refurbishmenArchitectural/HVAC Balance of Building.

Project Details

  • Owner: PT.International Nickel Co.(INCO)
  • Client: PT. INCO Davy Int’l/Beca Simons Ltd
    PT.Fluor Daniel Indonesia
  • Capacity: -
  • Location: Sulawesi

Kaltim Fertilizer Optimalization

Scope of Work :

Installation of Steel Structures
Installation of Mechanical Equipment
Installation of Pipes

Project Details

  • Owner: PT. Pupuk Kalimantan Timur
  • Client: PT. Rekayasa Industri
  • Capacity: -
  • Location: -

Kaltim-3 Fertilizer Plant

Scope of Work :

Installation of Mechanical Equipment
Installation of Boiler
Installation of Piping

Project Details

  • Owner: PT. Pupuk Kalimantan Timur
  • Client: PT. Rekayasa Industri/Chiyoda Chemical Eng’g Co.
  • Capacity: -
  • Location: -

Al-Safi Danone Plant in Riyadh

Scope of Work :

Mechanical & Piping Works

Project Details

  • Owner: Al Safi-Danone
  • Client: GEA Tuchenhagen
  • Capacity: -
  • Location: -

From our experience in making hundreds of factories from various industrial sectors that we have built, of course there will be a need for a maintenance and repair program for the facilities that have been operating. Through our experienced engineers, we continue to provide support in the maintenance program for all the infrastructure we have built and to support other industries.